assignments | solutions | supporting files |
---|---|---|
Project Network Planning Techniques: PERT, CPM (PDF) | (PDF) | (PDF) |
Task-based Design Structure Matrix (DSM) (PDF) | (PDF) | (PDF) |
Design of a Project Organization (PDF) | (PDF) | (PDF) |
System Dynamics 1: Simulation of the Rework Cycle (PDF) | (PDF) | (PDF) |
Cases Studies: Comparison of H/W and S/W Projects (PDF) | (PDF) | (PDF) |
System Dynamics 2: Project Adaptation (PDF) | (PDF) | (PDF) HW6_Capstone_Past_Project.mdl (MDL) |