The lab materials are step-by-step instructions on how to manufacture a tetrode array and microdrive assembly.
Modifications to Drive Construction Handout (PDF)
Sleep Box Construction (PDF)
Useful Tools (PDF)
Tetrode Making (PDF)
Animal Training (PDF)
Head Stage Construction (PDF)
Tetrode Burning (PDF)
First Week Task List
Team organization
Assign initial jobs/responsibilities
Start making raw drive parts, from simplest (5.5 and 6 mil wire) to more complex (in order of attached drive part making notes). Assembly of pieces together will come afterwards.
Animal Socialization
Spend some time with each animal individually – 10-15 minutes at least. Hold, pet, talk soothingly, allow them to explore, but not escape or feel endangered or threatened. Remember to wear a lab coat!
Toolkit Inventory List
Each team should have a toolkit consisting of the following items:
1. Tool Box (black)
2. Drive Parts Box (clear)
3. Pana-Vise for holding drive as it is being built and loaded
4. Scribe
5. Exacto-Knife
6. Large Pliers
7. Fine Pliers
8. Super Glue (2)
9. 1 ml Syringes (3)
10. 26 Gauge Needles (3)
11. Fine Scissors
12. Diagonal Cutters
13. Tetrode Tweezers
14. 0-80 Screws (100)
15. 0-80 Screw Taps (2)
16. Tap Handle
17. Tetrode Box
18. Tetrode Stripper (burner)
Notes on Drive Part Manufacturing
It's a good idea to make a few tools as well, like a 1 mil syringe handle with a long (>10 cm) piece of 23# on the end, cut at a 45-degree angle and sharpened; comes in very handy reaming out top piece holes, acrylic around 30# pieces, etc.